{"id":3006,"date":"2018-09-20T15:42:56","date_gmt":"2018-09-20T08:42:56","guid":{"rendered":"http:\/\/www.nature.org.vn\/en\/?p=3006"},"modified":"2018-09-20T15:42:56","modified_gmt":"2018-09-20T08:42:56","slug":"save-the-mekong-calls-for-new-transboundary-impact-assessment-and-suspension-of-pak-lay-dam","status":"publish","type":"post","link":"https:\/\/www.nature.org.vn\/en\/save-the-mekong-calls-for-new-transboundary-impact-assessment-and-suspension-of-pak-lay-dam\/","title":{"rendered":"Save the Mekong Calls for New Transboundary Impact Assessment and Suspension of Pak Lay Dam"},"content":{"rendered":"<p>On the occasion of the Mekong River Commission\u2019s (MRC) regional stakeholder forum on the Pak Lay Hydropower Project, Save the Mekong &#8211; a coalition of non-government organizations, community groups and concerned citizens in the Mekong region &#8211; <a href=\"http:\/\/www.nature.org.vn\/en\/wp-content\/uploads\/2018\/09\/200918_StM-Statement-on-Pak-Lay-assessment-v20Sept18.pdf\">calls<\/a> for a new Transboundary Environmental and Social Impact Assessment (TBESIA) and Cumulative Impact Assessment (CIA) for the proposed Pak Lay dam due to the poor quality of the current assessments. Pak Lay is the fourth dam on the lower Mekong mainstream in Lao PDR and has recently commenced the MRC\u2019s Prior Consultation procedure.<\/p>\n<p>The stated purpose of the Pak Lay TBESIA\/CIA is \u201cto provide decision makers with timely information on the potential transboundary and cumulative environmental and social consequences.\u201d(1)\u00a0However, due to serious flaws, the Pak Lay assessment does not provide a reliable basis to inform planning and decision-making on the potential transboundary and cumulative impacts of the project. Prior Consultation should therefore be halted until new assessments are conducted of a sufficient standard to ensure informed and meaningful participation in decisions regarding the project.<\/p>\n<p>Large sections of the Pak Lay TBESIA\/CIA report are simply copied directly from the Pak Beng dam TBESIA\/CIA report, dated 2015.\u00a0As a result, the Pak Lay report is flawed and out-dated, with most data and references dating prior to 2011. The Pak Beng TBESIA\/CIA was itself critiqued as containing inadequate data and analysis,(2)\u00a0prompting questions over the adequacy of the information relied upon to inform the Prior Consultation process.<\/p>\n<p>The Pak Lay assessment does not draw on available studies, including those conducted by the MRC. It incorrectly notes that the MRC\u2019s 2010 Strategic Environmental Assessment (SEA) of Mekong mainstream dams is not yet available.(3)\u00a0Relevant environmental and social legislation(4)\u00a0is incomplete and out of date.(5)\u00a0The Pak Lay assessment contains no references to the Council Study, conducted by the MRC over a six year period at a cost of USD 4.7 million to establish a reliable scientific evidence base on the environmental,\u00a0social and economic\u00a0impacts of Mekong development. The results of the study were intended to enhance Member Country planning processes and to inform prevention, mitigation or compensation options for water resource development.<\/p>\n<p>At least 90% of the Social Baseline Conditions section of the Pak Lay dam TBSEIA\/CIA(6)\u00a0is copied directly from the Pak Beng dam assessment,(7)\u00a0including photos, tables and text. It is worth noting that the MRC Technical Review of the Pak Beng dam \u201cstrongly recommended updating the socio-economic data.\u201d(8)\u00a0Given serious flaws in the socio-economic data and assessment of the Pak Beng TBESIA, the Pak Lay TBSEIA\/CIA cannot be considered a reliable baseline of social conditions in the Lower Mekong Basin.<\/p>\n<p>The Environmental Impacts and Mitigation section notes that after mitigation, all impacts from the Pak Lay dam will either be insignificant or positive.(9)\u00a0This section is not supported by evidence. Instead, it is copied from the Pak Beng assessment. The MRC Technical Review for Pak Beng identified insufficient evidence as a key concern; and recommended that the developer \u201cprovide more robust evidence for the effectiveness of the proposed mitigation measures, or acknowledge the uncertainty and adjust the assessment outcomes.\u201d(10)<\/p>\n<p>It is clear that there has not been meaningful public participation in the preparation of the Pak Lay assessment. For example, the Public Involvement section is an almost exact copy of the Pak Beng report, with the main change being the name of the dam. However, the authors neglected to change the name of the company, so the Pak Lay report still mentions Datang, which is actually the developer of Pak Beng.(11)<\/p>\n<p>During the recent ASEAN World Economic Forum in Vietnam, Lao Prime Minister Thongloun Sisoulith said that, \u201cfrom now on the construction of hydroelectricity dams in Laos must undergo proper studies\u201d and \u201cbe based on the conditions of top-quality studies and research. Designs must meet international standards and be scientifically sound.\u201d(12)<\/p>\n<p>Clearly, the Pak Lay TBESIA\/CIA cannot be considered top-quality, scientifically sound, or up to international standards. A new TBESIA\/CIA must be conducted for the proposed Pak Lay hydropower project. To be credible and reliable, the new TBESIA should draw on updated studies, conduct meaningful consultations with potentially affected communities, including those in neighbouring countries, and must be conducted in accordance with international standards. The Pak Lay dam should be suspended until a new TBESIA\/CIA is completed. The MRC should halt the Pak Lay Prior Consultation and require assessments of sufficient quality to support an informed and meaningful consultation process.<\/p>\n<p><b><span lang=\"EN-GB\">Save the Mekong Coalition<br \/>\n<span class=\"aBn\" tabindex=\"0\" data-term=\"goog_13249675\"><span class=\"aQJ\">20 September 2018<\/span><\/span><\/span><\/b><\/p>\n<hr \/>\n<div>\u00a0<span lang=\"EN-AU\">[1] The Pak Lay TBESIA\/CIA Report is available at:\u00a0<\/span><a href=\"http:\/\/www.mrcmekong.org\/topics\/pnpca-prior-consultation\/pak-lay-hydropower-project\/\" target=\"_blank\" rel=\"noopener\" data-saferedirecturl=\"https:\/\/www.google.com\/url?hl=en&amp;q=http:\/\/www.mrcmekong.org\/topics\/pnpca-prior-consultation\/pak-lay-hydropower-project\/&amp;source=gmail&amp;ust=1537519027905000&amp;usg=AFQjCNFapWUufK6ahQz8kB3dcUzxcLXwIw\"><span lang=\"EN-AU\">www.mrcmekong.org\/topics\/<wbr \/>pnpca-prior-consultation\/pak-<wbr \/>lay-hydropower-project\/<\/span><\/a><span lang=\"EN-AU\">.\u00a0<\/span><\/p>\n<div id=\"m_-5269388346190782024ftn2\">\n<p class=\"m_-5269388346190782024MsoFootnoteText\">[2]\u00a0\u00a0<a href=\"http:\/\/www.internationalrivers.org\/resources\/independent-expert-review-of-the-pak-beng-dam-eia-16488\" target=\"_blank\" rel=\"noopener\" data-saferedirecturl=\"https:\/\/www.google.com\/url?hl=en&amp;q=http:\/\/www.internationalrivers.org\/resources\/independent-expert-review-of-the-pak-beng-dam-eia-16488&amp;source=gmail&amp;ust=1537519027905000&amp;usg=AFQjCNG2xbKkJMe9ewO6vKbMe_tXUbGNqw\">www.internationalrivers.<wbr \/>org\/resources\/independent-<wbr \/>expert-review-of-the-pak-beng-<wbr \/>dam-eia-16488<\/a><span lang=\"EN-GB\">.<\/span><\/p>\n<\/div>\n<div id=\"m_-5269388346190782024ftn3\">\n<p class=\"m_-5269388346190782024MsoFootnoteText\"><span lang=\"EN-GB\">[3] p. 38.<\/span><\/p>\n<p class=\"m_-5269388346190782024MsoFootnoteText\">[4]\u00a0<span lang=\"EN-GB\">Section 1.7.1 (p.27-28) and Section 1.7.3, p.31-35.<\/span><\/p>\n<\/div>\n<div id=\"m_-5269388346190782024ftn5\">\n<p class=\"m_-5269388346190782024MsoFootnoteText\"><span lang=\"EN-GB\">[5] E.g. relevant laws and policies such as the Water and Water Resources Law (2017), the Revised Environmental Protection Law (2012), the Policy on Sustainable Hydropower Development (PSHD) (2015), and the PSHD Implementation Guidelines (2016) are not mentioned.<\/span><\/p>\n<p class=\"m_-5269388346190782024MsoFootnoteText\"><span lang=\"EN-GB\">[6] Section 3.8<\/span><\/p>\n<p class=\"m_-5269388346190782024MsoFootnoteText\"><span lang=\"EN-GB\">[7]\u00a0<\/span><a href=\"http:\/\/www.mrcmekong.org\/assets\/Consultations\/PakBengBengHydropowerProject\/19.Transboundary+Environmental+and+Social+Impact+AssessmentCummulative+Impact+Assessement.pdf\" target=\"_blank\" rel=\"noopener\" data-saferedirecturl=\"https:\/\/www.google.com\/url?hl=en&amp;q=http:\/\/www.mrcmekong.org\/assets\/Consultations\/PakBengBengHydropowerProject\/19.Transboundary%2BEnvironmental%2Band%2BSocial%2BImpact%2BAssessmentCummulative%2BImpact%2BAssessement.pdf&amp;source=gmail&amp;ust=1537519027905000&amp;usg=AFQjCNEg6YRyga6jWHEhJpo2BlkePMHrvg\">www.mrcmekong.org\/assets\/<wbr \/>Consultations\/<wbr \/>PakBengBengHydropowerProject\/<wbr \/>19.Transboundary+<wbr \/>Environmental+and+Social+<wbr \/>Impact+AssessmentCummulative+<wbr \/>Impact+Assessement.pdf<\/a><span lang=\"EN-GB\">.\u00a0<\/span><\/p>\n<\/div>\n<div id=\"m_-5269388346190782024ftn8\">\n<p class=\"m_-5269388346190782024MsoFootnoteText\"><span lang=\"EN-GB\">[8] MRC Secretariat (2017, p.78) Technical Review Report: Prior Consultation for the Proposed Pak Beng Hydropower Project, available through:\u00a0<\/span><a href=\"http:\/\/www.mrcmekong.org\/topics\/pnpca-prior-consultation\/pak-beng-hydropower-project\/\" target=\"_blank\" rel=\"noopener\" data-saferedirecturl=\"https:\/\/www.google.com\/url?hl=en&amp;q=http:\/\/www.mrcmekong.org\/topics\/pnpca-prior-consultation\/pak-beng-hydropower-project\/&amp;source=gmail&amp;ust=1537519027905000&amp;usg=AFQjCNFxB7ttg9rV0ykmI0srH6gLkVpyZg\">www.mrcmekong.org\/topics\/<wbr \/>pnpca-prior-consultation\/pak-<wbr \/>beng-hydropower-project\/<\/a><span lang=\"EN-GB\">. \u00a0\u00a0<\/span><\/p>\n<\/div>\n<div id=\"m_-5269388346190782024ftn9\">\n<p class=\"m_-5269388346190782024MsoFootnoteText\"><span lang=\"EN-GB\">[9] Appendix B, p.293-297.<\/span><\/p>\n<\/div>\n<div id=\"m_-5269388346190782024ftn10\">\n<p class=\"m_-5269388346190782024MsoFootnoteText\"><span lang=\"EN-GB\">[10] MRC Secretariat (2017, p.78) Technical Review Report: Prior Consultation for the Proposed Pak Beng Hydropower Project.<\/span><\/p>\n<p class=\"m_-5269388346190782024MsoFootnoteText\"><span lang=\"EN-GB\">[11] See p. 270 and p.274<\/span><\/p>\n<\/div>\n<div id=\"m_-5269388346190782024ftn12\">\n<p class=\"m_-5269388346190782024MsoFootnoteText\">[12]\u00a0<a href=\"http:\/\/www.vientianetimes.org.la\/FreeContent\/FreeConten_Development_of_215.php\" target=\"_blank\" rel=\"noopener\" data-saferedirecturl=\"https:\/\/www.google.com\/url?hl=en&amp;q=http:\/\/www.vientianetimes.org.la\/FreeContent\/FreeConten_Development_of_215.php&amp;source=gmail&amp;ust=1537519027905000&amp;usg=AFQjCNFUqTfTgJ0jyTrcCFbRk5CiH5WQBw\">www.vientianetimes.org.<wbr \/>la\/FreeContent\/FreeConten_<wbr \/>Development_of_215.php<\/a><span lang=\"EN-GB\">.<\/span><\/p>\n<\/div>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>On the occasion of the Mekong River Commission\u2019s (MRC) regional stakeholder forum on the Pak Lay Hydropower Project, Save the Mekong &#8211; a coalition of non-government organizations, community groups and concerned citizens in the Mekong region &#8211; calls for a new Transboundary Environmental and Social Impact Assessment (TBESIA) and Cumulative Impact Assessment (CIA) for the proposed Pak Lay dam due to the poor quality of the current assessments. Pak Lay is the fourth dam on the lower Mekong mainstream in Lao PDR and has recently commenced the MRC\u2019s Prior Consultation procedure.<\/p>\n","protected":false},"author":6,"featured_media":2447,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[6,40],"tags":[],"post_series":[],"class_list":["post-3006","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","category-media","entry","has-media"],"_links":{"self":[{"href":"https:\/\/www.nature.org.vn\/en\/wp-json\/wp\/v2\/posts\/3006","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.nature.org.vn\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.nature.org.vn\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.nature.org.vn\/en\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/www.nature.org.vn\/en\/wp-json\/wp\/v2\/comments?post=3006"}],"version-history":[{"count":1,"href":"https:\/\/www.nature.org.vn\/en\/wp-json\/wp\/v2\/posts\/3006\/revisions"}],"predecessor-version":[{"id":3008,"href":"https:\/\/www.nature.org.vn\/en\/wp-json\/wp\/v2\/posts\/3006\/revisions\/3008"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.nature.org.vn\/en\/wp-json\/wp\/v2\/media\/2447"}],"wp:attachment":[{"href":"https:\/\/www.nature.org.vn\/en\/wp-json\/wp\/v2\/media?parent=3006"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.nature.org.vn\/en\/wp-json\/wp\/v2\/categories?post=3006"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.nature.org.vn\/en\/wp-json\/wp\/v2\/tags?post=3006"},{"taxonomy":"post_series","embeddable":true,"href":"https:\/\/www.nature.org.vn\/en\/wp-json\/wp\/v2\/post_series?post=3006"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}